Greetings Busnuts!
It's been about six months since we posted, but we're back. We spent two months of FULL-time work on the conversion of our 1978 MCI-5, the "Silverliner," this summer. This is a brief summary of what we did:
- Removed seats & overhead bins
- Demolished floor and subfloor plywood
- Removed seat rails
- Removed metal interior walls
- Removed OTR air con
- Removed ceiling
- Removed bags and bags and more bags of old insulation
- fabricated metal brackets for interior and exterior attach points and welded to bus frame
- Installed roof fan and black water vent
- Ran conduit and wiring
- Spray foam (FoamItGreen) the roof and walls
- Replaced metal walls by re-riveting them
- Installed new floor of tarpaper / plywood / pinkboard insulation / plywood
- Bus Kote the roof
- Painted the exterior
- Installed 24v LED lights all around
- Moved the gear shift lever from the drivers right side to left side
- Ginned up a poor-man's window a/c interior install (actually works well)
- Installed back-up camera and monitor
We're at the "tin tent" stage now, and with the Tampa weather starting to become reasonable, the project resumes....
We documented most of this with
pics and video, which we're just now starting to post in the "Bus Projects" section of this website, under "Introducting the Silverliner." There's already
THIRTY FIVE (35) videos linked / embedded there. Feel free to peruse them and offer criticism as you see fit.
http://www.busconversions.com/bbs/index.php?topic=23466.30 If the videos won't play or won't show up, just click on their names under them.
But what we could use most is advice on the ORDER in which to proceed from here. We're thinking:
- Ceiling
- Beds/Cabinets
- Plumbing/Electrical
Any advice is appreciated!!!!